Takeuchi excavator strapped to a flatbed truck on the highway
Rental Guide

Equipment Delivery Checklist: Be Ready Before the Truck Arrives Gates, ground, wires, signatures and photos, plus the stuff that turns a ten minute drop into a wasted morning

Disclosure. We rent equipment and deliver it, so we want your delivery to go well. Partly for you. Partly because a bad delivery ruins our driver's day, and he will tell the whole yard.

Short answer: Before construction equipment delivery, measure every gate and path the machine must pass, pick a flat, firm unloading spot the truck can reach, check for overhead lines and trees, and have someone on site who can sign and walk the machine. Take photos of the equipment when it arrives, and plan one spot where it will sit for pickup.

The truck is never the problem. The gate is the problem. Sometimes the wire is the problem.

Most delivery trouble is boring. A side yard that was 4 feet wide on the phone turns out to be 34 inches at the hose bib. The driveway is steeper than anyone mentioned. Nobody is home. A power line hangs right where the ramp needs to go.

Jump to what you came for

Compact excavator fitting through a narrow side gate
Start with a tape measure

Gates, Paths and the Narrowest Point

Your gate is only the first narrow point. Walk the whole route from the street to the work and measure the tightest spot.

Measure the pinch points

Width, not just at the gate
Gate posts, hose bibs, AC units, gas meters and the neighbor's leaning fence. Measure at ground level and waist height. Machines are not always widest at the tracks.
Height
Patio covers, eaves, gate arbors and low tree limbs. A machine with a canopy or cab is taller than people picture.
Turns and slopes
A path that is wide enough going straight may not be wide enough at a 90 degree corner. Side slopes on hillside lots matter too. Tell us about them.

Then ask for the machine's real numbers

Give the rental desk your narrowest measurement and ask for the width and height of the specific machine they plan to send, in the configuration it will travel in. Some compact excavators have tracks that retract to get through tight spots. Leave yourself a few inches of margin on each side.

If it does not fit, that is useful news: a smaller machine, a different route, or a fence panel pulled for a day. Our mini excavator sizing guide covers the tradeoff between the machine that fits and the machine that digs fast, and the ADU equipment guide deals with the tight backyard version of this problem in detail.

PDQ delivery truck parked at a ranch property
Where the truck stops

Pick the Unloading Spot Before the Driver Does

If you do not pick the unloading spot, the driver will, and it may not be where you wanted the machine sitting.

What a good unloading spot looks like

Flat and firm
Ramps and tilt decks want level ground. Unloading on a slope is where machines slide. Pavement or compacted base is ideal. Fresh fill, wet clay and soft lawn are not.
Room for the whole rig
Truck, trailer, ramps, plus room for the machine to come off and turn. Cul de sacs and canyon roads make this tricky. Ask what vehicle is coming.
Clear of things that crack
Thin residential driveways, curbs, gutters, utility boxes and buried irrigation. A loaded truck is heavy. If you would not park a delivery truck on it, do not ask us to.

Street, driveway or jobsite

Unloading in the street is common on residential jobs. Move the cars, keep kids and dogs clear, and check with the city, HOA or property manager about any rules on trucks and staging. We will not guess at your local rules.

On commercial and grading jobs, tell us the gate entrance, any site check in procedure and where the laydown area is.

Summer heat and dust

In August, dirt in Riverside County and inland San Diego County turns to powder that hides ruts. Walk the spot the morning of delivery.

Look up, then look down

Overhead Lines, Trees and What Is Buried

Tilt decks lift. Booms swing. Lifts and reach forklifts go where wires live. This is the item on the list most likely to hurt someone.

Overhead

Power lines over the unloading spot
If there are lines above where the truck parks or the machine works, tell us before delivery. Safety rules and utilities set minimum clearances, and 10 feet is a commonly cited minimum for typical distribution lines, more for higher voltage. If you are not sure what voltage a line carries, assume the worst and call the utility.
Service drops and phone lines
The line from the pole to the house is often lower than the street lines. So is cable and phone. They count.
Trees and eaves
Trim low limbs before the truck shows up, not after a branch takes out a mirror or a canopy light.

Underground

If the equipment is going to dig, call 811 before the machine arrives. In Southern California that request goes to DigAlert, which notifies member utilities to mark their lines. Allow time for the marking. Private lines such as sprinklers, low voltage lighting, a line to a detached garage or a septic system are usually not marked by the utilities, so find those yourself.

Somebody has to be home

Who Signs, Who Watches, Who Runs It

The most common delivery headache is nobody answering the phone.

Have a person on site

Someone who knows where the machine goes and is allowed to sign should meet the truck. If you cannot be there, name that person when you book and give the desk their cell number.

Have the paperwork done first

Sort out the account, ID, payment and any insurance certificate before delivery day so nothing holds up the drop. PDQ's posted rental policies say a valid California driver's license is required for all rentals, a utility bill or major credit card may be required as a second ID, and proof of insurance is required for truck rentals. Deposits vary by item. The signed rental contract is what governs. If you are still sorting out the waiver versus your own coverage, our guide to rental damage coverage vs. insurance walks through the questions, and the first timer version of all of this is in renting equipment for the first time.

Who actually runs the machine

Delivery is not training. Make sure whoever operates the equipment knows that machine type and has whatever training or certification the work calls for, especially on lifts and reach forklifts. Ask the driver to show the controls, the shutoff and the tie down points if it is a model you have not run. Better than learning on a hillside with the neighbors watching.

Ninety seconds with your phone

Photos and the Walkaround at Drop Off

Every rental return dispute is easier when both sides have pictures.

Take photos and a short video when the machine comes off the truck. Working machines have scratches. Do not pay for ones you did not make.

What to photograph

All four sides, plus the attachment
Wide shots first, then close ups of existing dents, cracked glass, torn seats and worn tracks or tires.
Hour meter and fuel gauge
PDQ's posted rental policies base hour metered items on 8 hours per day, 40 per week and 160 per month, with overtime rates beyond that. A clear photo of the starting hours protects you.
Leaks and loose parts
Look under the machine and at hydraulic fittings. A wet spot at delivery is worth a photo and a mention on the spot.
Who should check what at delivery
ItemYour jobAsk the driver
Unloading spot and routePick it and clear itConfirm it works for the rig
Existing damagePhotograph itNote it if needed
Hours and fuelPhotograph bothConfirm the reading
Controls and shutoffKnow your limitsShow you once
Attachments and keysCount themConfirm what was sent
Overhead and buried hazardsFind and flag them firstNot a substitute for 811
When it shows up

Timing the Drop So You Actually Use It

A machine that arrives at 2 pm in December gives you maybe two and a half hours of light in Southern California. Fine for staging. A waste if you wanted to dig.

Book the window, not just the day

Ask for a delivery window and plan around it. Delivery and pickup are available, and PDQ's posted rental policies say rates vary by equipment type and delivery location, so ask for the delivery charge on the quote rather than discovering it on the invoice. Our guide to the costs to check on a rental quote covers the rest.

Seasons change the plan

Winter
Early sunsets and storm days. If rain is forecast, talk to the desk before the truck rolls. Mud makes unloading spots soft and hillside access sketchy. Our guide on what happens when your job gets delayed covers rain days.
Summer
Early drops beat the heat. Crews in the Inland Empire and inland San Diego County often want the machine working by 7 and parked by early afternoon.

Should you just pick it up yourself

Sometimes yes. If you already own a truck and trailer rated for the load and know how to tie down a machine, will call can make sense. Be honest about it, though. Our guide on mini excavator weight and California towing rules explains why plenty of half ton pickups should not be pulling what people hook to them. Paying for delivery is often cheaper than finding out the hard way.

Aerial view of the PDQ Escondido yard full of Kubota equipment
The part that costs money

The Rental Clock and Getting Ready for Pickup

Delivery changes when your rental starts and stops, which changes what you pay.

When the clock starts

PDQ's posted rental policies say that on delivered rentals the clock starts when the equipment is received. On will call, it runs from when you pick it up until you drop it back at a PDQ location. The signed rental contract governs, so check yours.

When the clock stops

On a delivered rental, the posted policies say the clock stops when you call the equipment off rent and PDQ issues a termination number. Write that number down. After you call it off, the equipment has to be accessible and available for pickup, and you are still responsible for keeping it safe until it is picked up.

One spot for everything
The posted policies ask that rental items be gathered in a single location convenient for pickup. Put the machine, the attachments and the keys where the truck can reach them, ideally the same spot it was unloaded.
Secured and out of the weather
Responsibility for the rental stays with you from delivery to return, per the posted policies, and missing or damaged items are charged for replacement. A machine parked at the curb overnight in LA County is a temptation. Lock it, take the key, and do not leave attachments lying around.

Things like cleaning expectations, swap timing and weekend pickups are not in the posted policy summary, so ask the desk and check the posted rental policies. Our guide to returning rental equipment covers the pickup side of this in more detail.

If you read nothing else

The Short Version

Measure the narrowest point

Walk the whole route and measure the tightest spot. Then ask for the real width and height of the machine being sent.

Pick a flat, firm spot

Level ground with room for the truck, the ramps and the machine. Not fresh fill, not a thin driveway.

Look up and call 811

Flag power lines and low limbs. If you will dig, get the lines marked before delivery day.

Be there and take photos

Someone who can sign, plus photos of damage, hours and fuel. Then keep the termination number when you call it off.

Run this the day before

The Delivery Day Checklist

  1. What is the narrowest width and lowest height on the route, and does the machine fit with margin?
  2. Where exactly will the truck park and unload, and is that ground flat and firm?
  3. Are there power lines, service drops or low limbs over the unloading or work area?
  4. If we are digging, have the lines been marked through 811, and do we know where private lines and septic are?
  5. Who will meet the truck, can they sign, and does the desk have their cell number?
  6. Are ID, payment, deposit and any insurance certificate sorted before delivery?
  7. Who will photograph the machine, the hour meter and the fuel gauge at drop off?
  8. Where will the machine and attachments sit, secured, for pickup?
Questions we get

Straight Answers

How do I prepare for construction equipment delivery?

Measure the narrowest point on the route, pick a flat and firm unloading spot, check for overhead lines, call 811 if you will dig, and have someone on site who can sign and take photos.

How wide does a gate need to be for a mini excavator?

It depends on the machine. Measure your narrowest point, then ask the rental desk for the width of the specific model with its tracks in travel position, and leave a few inches of margin on each side. If it will not fit, a smaller machine or a different route is usually the answer.

Do I need to be home when rental equipment is delivered?

Someone should be. That person needs to know where the machine goes and be allowed to sign. If you cannot be there, name them when you book.

Can a delivery truck unload on my street?

Often yes on residential jobs, but local rules, HOAs and property managers can restrict trucks and staging. Check before delivery day and make sure there is level room for the truck, ramps and machine.

When does the rental clock start on a delivered rental?

PDQ's posted rental policies say the clock starts when the equipment is received and stops when you call it off rent and receive a termination number. The signed rental contract governs, so confirm the terms on yours.

Should I take pictures of rental equipment at delivery?

Yes. Photograph all four sides, any existing damage, the attachments, the hour meter and the fuel gauge. Keep the photos until the rental is closed and any charges are settled.

Measure First, Call Second

Fine, We Want the Delivery

A rental company writing a delivery checklist is a little like a pizza place reminding you to turn your porch light on. We benefit. We admit it.

Send us your narrowest measurement, a photo of the driveway or street, and what the machine needs to do. We will tell you what fits, where the truck can park, and when the honest answer is a smaller machine or a pickup you handle yourself. You can also browse the rentals catalog first.

Since 1952 our drivers have seen every kind of gate. The worst ones were always described as "plenty wide" on the phone.

Los Angeles
Sun Valley
213-513-7423
Temecula
Riverside County
951-517-2979
San Diego
Escondido
619-363-0440

Request a Quote or More Info

No spam. No bots. Just real people who know equipment.

Family owned since 1952 Los Angeles · Temecula · San Diego